Project information
Access capacity to the grid of a demand at Muniesa substation
December 2024 - December 2024
Funding entity Endesa Energia
The aim of the collaboration is the study of the factors that may affect the access capacity of a demand in the Muniesa 499 substation.
Research topics:
- Steady-state: Load flows, analysis of power system constraints, optimal load flows, voltage control ancilliary service,short-circuits, protections in transmission and ditribution networks
- Stability: Large disturbance stability, tuning of frequency loadshedding schemes, excitation control, small disturbance stability, tuning of power system stabilizers, identification of AVR and governor models
EndesaDemandaMuniesa