Project information
Access capacity to the grid of a demand at Muniesa substation
December 2024 - December 2024
Funding entity Endesa Energía, S.A.U.
The aim of the collaboration is the study of the factors that may affect the access capacity of a demand in the Muniesa 499 substation.
Research topics:
- Steady-state: Load flows, analysis of power system constraints, optimal load flows, voltage control ancilliary service,short-circuits, protections in transmission and ditribution networks
EndesaDemandaMuniesa